From November 2008 to July 2013, Duwa Piping was required to supply piping material to one Egyptian gas pipeline project. The project was in need of the Pipe-Rack, which was to connect the new process area to the existing plant; the process interface building which was located in the new area to accommodate both electrical and instrumentation equipment; connection to the existing utilities and those utilities that needs to upgrade.